摘要
从变电站运行以及管理的过程中来看,事故是由于当事人对有可能造成伤害的危险点缺乏事先预想。因此,做好危险点的分析预控工作,就会令有可能诱发事故的各种因素得以避免,将事故遏制在萌芽状态,使我们的生产工作可控、在控。
In view of the management process of substation operation, the accident was due to the lack of anticipation to the possible risk leading to damage. Therefore, to do a good job of analysis and pre-control of dangerous point can avoids various factors that make possible the accident to happen. This wil contain dangers in the bud, to make the production work in control.
出处
《城市建筑》
2014年第26期182-182,共1页
Urbanism and Architecture
关键词
运行管理
危险点
风险分析
operation management
risk points
analysis of ri-sk