摘要
本文主要深入探讨了衡水市南水北调配套工程水厂以上输水管道第3设计单元工程土工试验指标,并提出了自己的观点。
This paper mainly describes the test index of the third design unit of above water pipeline engineering of south to north water transfer project water plant in Langfang city, and put forward my own opinion.
出处
《城市建筑》
2014年第29期257-257,共1页
Urbanism and Architecture
关键词
南水北调配套工程
输水管道
土工试验
South to North water diversion pipeline engineer-ing
water pipeline project
geotechnical test