摘要
南水北调温博三标大沙河倒虹吸CFG桩试验区施工,在检测时发现了质量问题。通过一系列的分析、研究,找到了出现质量问题的原因。本文就这个问题进行了分析总结,希望能为以后的CFG桩施工提供借鉴。
The south to North Water Diversion Wenbo three standard Shahe inverted siphon CFG pile test area construction, we discovered quality problems in the detection. Through a se- ries of analysis and research, we found the causes of quality pr- oblems. In this paper, the author analyzed and summarized the problems, hoping to provide reference for the future construc- tion of CFG pile.
出处
《城市建筑》
2014年第33期105-105,共1页
Urbanism and Architecture
关键词
CFG桩
复合地基
承载力
CFG pile
composite foundation
bearing capacity