摘要
本文简述了子牙新河险工的基本情况,对堤身及堤基险工进行了隐患分析。应针对各段险工的不同情况,分别采取不同的处理措施。
This paper briefly introduces the basic situation of risky sections of New Ziya Riverway, making an analysis of the risky sections of embankment and foundation. We should took different measures respectively aiming at diferent situ- ations of each risky section.
出处
《城市建筑》
2014年第33期271-271,共1页
Urbanism and Architecture
关键词
险工
措施
分析
risky section
measures
analysis