摘要
本文从介绍水电站移民安置点场地的特殊性和安置点场地设计涉及专业和考虑因素众多的特点展开,通过分析比对工作中遇到的三个典型移民安置点场地设计实例,引出了移民安置点设计需注意协同的控制要点,希望能为今后移民安置点工程及类似工程提供借鉴。
This paper, from the introduction of numerous pro- fessional factors needing consideration of the special hydro- power station resetlement site and resettlement site design, th- rough the analysis of three typical resettlement site design ex- amples encountered in practical work, showed that the resetl- ement design should pay atention to the control points of co- laboration, hoping it can provide reference for the resetlement projects and similar projects in future.
出处
《城市建筑》
2014年第33期314-314,共1页
Urbanism and Architecture
关键词
移民安置
专业协同
设计前期
resetlement
professional colaboration
design prophase