国内大型循环流化床电站的主厂房布置在设计中存在套用传统布置模式而优化创新不够的问题,造成了不必要的浪费。本文结合某600MW循环流化床电站采用二炉一机热力系统,提出了一种优化的主厂房布置方案,并与国内典型布置方案进行了技术经济比较分析,探讨主厂房布置的优化设计的可行性。
The stereotype layout of main building is designed in domestic large CFB power plant, and it is not enough for the optimization design of layout which induce s unnecessary waste. This paper put forward the optimization design proposal of main building layout based on two boiler one turbine thermal system 600MW CFB power plant which is compared with the typical layout through technical and economic analysis, and discusses the technical and economical feasibility of optimization design.
出处
《电力勘测设计》
2015年第2期24-26,31,共4页
Electric Power Survey & Design