摘要
走出国门建造中国标准高速铁路的企业,确定或论证经济活动指标是企业的必经过程。为规避企业行为风险,文章结合铁路建设企业当前在国外的具体施工情况,通过确定工程造价基础数据的收集内容,提出确定或论证海外高速铁路造价的概算编制建议采用方法的理由,高速铁路建筑安装工程费用的确定具体做法。其中包括海外工程涉及较多的通过海运组织材料供应的知识简介,以及其他应考虑的费用等有关问题进行探讨,以期达到工程概算以工程工料机费等成本为基数,另加上合适的利润,即成本加利润的方式来确定或论证海外铁路造价。符合走出去快节奏和工程数量清单报价常规模式需求,具有可操作性。
For the enterprises which abroad to build China standard high-speed railway, the determination of economic activity object is an inevitable process of the enterprise. To avoid the risk of corporate behavior, it combins with the cur-rent construction abroad, by determining basic data of the project cost, the paper demonstrates the reasons for chaasing the budget estimate making method of overseas high speed railway cost as well as determining the civil and erection cost of high speed railway, the related issues, such as the material supplies by sea which is currently in creasingly involved in oversea engineering, and other costs should be considered are discussed so as to achieve the so-called cost-plus ap-proach to determine or demonstrate the cost of overseas railway. This conforms to normal mode requirements of QB list offer, and it is also very practical.
出处
《高速铁路技术》
2015年第2期101-106,共6页
High Speed Railway Technology
关键词
海外高速铁路
概算编制
设计原则
overseas high-speed railway
budget estimate making
design fundamentals