超高压输变电设备发热缺陷的统计与分析处理 被引量:13

Statistics and Treatment of Overheating Defect of EHV Power Transmission Equipment
下载PDF
导出
摘要 笔者对超高压输电公司从2009年1月至2013年5月期间的输变电设备发热缺陷进行统计,从缺陷的类型、时间、区域3个方面对设备的发热情况进行了总体分析,梳理出设备发热缺陷的原因和规律,归纳出需高度关注的设备和部件,并结合日常巡视维护、设备检修、技术改造,提出开展设备接头安装规范化管理工作、确定设备接头安装关键步骤工艺控制标准、校核设备接线板的载流能力等改进措施。 This paper counts the overheating defects of the power transmission equipment in EHV Power Transmission Company from January 2009 to May 2013. It analyzes the overall overheating cases in three aspects of the types, time and zones of the defects. It teases out the causes and the regular patterns of the overheating defects of equipment and generalizes the equipment and components which should be highly concerned. It proposes the targeted improvement measures combined with routine maintenance inspections, equipment overhaul and transformation, including standardized installation of equipment connectors, determining the process control standard of the key steps of the equipment connector installation and checking the current carrying capacity of the equipment wiring boards.
出处 《高压电器》 CAS CSCD 北大核心 2015年第5期180-183,187,共5页 High Voltage Apparatus
关键词 输变电设备 发热缺陷 原因和规律 改进措施 power transmission equipment overheating defect cause and regular pattern improvement measures
  • 相关文献

参考文献21

二级参考文献68

共引文献208

同被引文献156

引证文献13

二级引证文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部