摘要
针对油坊壕矿井侏罗系破碎带凿井技术难题,通过分析研究提出了三个井筒侏罗系破碎带采用冻结法施工方案,并根据现行钢筋混凝土设计规范,提出了高强混凝土井壁结构。
aiming at the technological problem of the shaft sinking through Jurassic fracture zone in Youfanghao mine, through the analysis, proposed the freezing construction method to sink three shafts through Jurassic fracture zone, according to the current code for design of reinforced concrete, put forward the high strength concrete shaft lining structure.
出处
《山东煤炭科技》
2015年第5期5-6,8,共3页
Shandong Coal Science and Technology
关键词
侏罗系破碎带
冻结立井
高强混凝土
jurassic fracture zone
freezing shaft
high strength concrete