摘要
本文阐述了有污水收集要求的引桥排水沟的结构设计方案,对无锡(江阴)港申夏港区港口集团通用码头工程1#引桥提出了合理的排水沟设计方案,并针对该方案,比较了对横向分配系数的影响,可供类似工程参考。
The drain structure of bridge approach was expounded, which met sewage water collecting requirement. A reasonable drain design option was proposed for bridge approach 1# project of Shenxia harbor general-purpose terminal at Wuxi (Jiangyin) port. By comparing and study the effect of the above option on transverse distribution coefficient, some research results were obtained which served as references for similar projects.
出处
《港工技术》
2015年第2期38-41,共4页
Port Engineering Technology
关键词
横向分配系数
大跨度引桥
排水沟
结构设计
transverse distribution coefficient
large-span bridge approach
drain
structural design