摘要 介绍印度斯坦锌业公司SK铅锌矿千米立井安全快速施工技术。立井井筒净直径7.5m,深度1 051.5m,为印度矿山行业最深的立井井筒。井筒配置先进的施工装备,采用科学合理的施工方法和一系列安全技术措施,有效地克服了井下高温和硬岩爆破的难题,最高月单进150.8m,从而达到安全、优质、快速施工的目的,充分体现了中国建井技术水平。 The safe and rapid construction technology of 1 000m deep shaft of SK lead and zime mine in Hindustan Zinc was introduced. The shaft had a net diameter of 7.5m and a depth of 1 051.5m, which is the deepest vertical shaft of mining industry in India. In order to overcome problems of high tempe- rature in underground and hard rock blasting, the advanced construction equipments were adopted, the construction method of scientific and reasonable as well as a series of measure of safety and tech- nology were applied. The highest month shaft completed was 150.8m. All of these ensure reach the goal of safety, excellent and rapid excavation, which reflects China^s mine construction technological level fully.
作者 江军 桑华
出处 《建井技术》 2015年第1期8-10,29,共4页 Mine Construction Technology
关键词 印度铅锌矿 深立井开凿 坚硬岩石 多水平开口 India lead and zime mine^deep shaft sinking hard rock multilevel opening
  • 相关文献

参考文献4

二级参考文献4

共引文献10

同被引文献1

  • 1杨念哥.会东铅锌矿三维矿床模型开发与应用研究[D].贵州:昆明理工大学出版社,2011.

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部