立井转平巷施工工艺及机械化配套技术 被引量:3

The Craft of Mine Shaft Changed to Drift Construction and Its Mechanized Completed Equipment Technology
下载PDF
导出
摘要 石拉乌素煤矿风井由立井转平巷施工过程中,利用立井凿井设施,采用凿岩台车钻眼、防爆装载机装岩、防爆胶轮车运输、井底水窝储矸、中心回转抓岩机抓岩、吊桶提升的作业方式,工作面全断面一次爆破和清底。采用胶带输送机向底卸式吊桶送料,吊桶向防爆胶轮车卸料,防爆胶轮车运料,PS-6I混合型湿喷机喷混凝土,减少物料运输环节,提高下料和运输物料的速度。从而,克服了井下空间狭窄,无法大量存放、搅拌喷射混凝土料的困难,提高了支护工作效率。 In shaft changed to drift construction of the ventilating shaft in Shilawusu Coal Mine, we used its shaft sinking facilities, and adopted the operation mold of drilling holes by drill rig, loading rocks by explosion proof loader, transporting rocks by explosion-proof rubber-tyred vehicle, stockpil- ing rocks in water nest of the shaft bottom, seizing rocks by central rotated rock-seizing machine, ele- vating rocks by hoisting bucket, these could achieve full-face excavation by one blasting and one bot- tom clearing. And we adopted belt conveyor transporting material to bottom unloading type automatic discharge bucket, hoisting bucket unloading material to explosion-proof rubber-tyred vehicle, explo- sion-proof rubber-tyred vehicle transporting material, mixed type wet spraying machine spraying con- crete, these could reduce the links of transporting material, and increase the speed of casting and transporting material. Thus, we overcame the difficulties of underground narrow space, could not store and stir a lot of stirring shotcrete material, improve support efficiency.
出处 《建井技术》 2015年第1期14-17,共4页 Mine Construction Technology
关键词 立井转入平巷 施工工艺 机械化配套 湿喷机 凿岩台车 mine shaft change to drift construction technology mechanized completed equipment wet spraying machine drill rig
  • 相关文献

参考文献3

二级参考文献16

  • 1金振奎,冯增昭.煤的含硫量与沉积环境的关系[J].复式油气田,1994,5(1):24-27. 被引量:4
  • 2李晓玲.煤产地含煤地层的沉积规律及控制因素[J].西部探矿工程,2006,18(9):126-127. 被引量:2
  • 3代世锋,刘玉荣,任德贻.煤中硫的形成及其控制因素[J].山东矿业学院学报,1996,15(4):7-11. 被引量:9
  • 4西南师范学院.重庆及其邻区地震地质研究报告[R].重庆:西南师范学院,1981.
  • 5张文佑.中国主要断裂构造系统的应力分析.科学通报,1960,5(19).
  • 6四川煤田地质公司136队.四川省松藻矿区松藻煤矿一井勘探(延深)地质报告[R].重庆:四川煤田地质局136队,1989.
  • 7四川煤田地质公司136队.四川省松藻矿区羊叉滩井田精查补充勘探地质报告[R].重庆:四川煤田地质局136队,1988.
  • 8四川煤田地质公司136队.重庆煤炭工业公司松藻矿务局打通一矿矿井(补充勘探)地质报告[R].重庆:四川煤田地质局136队,1994.
  • 9四川煤田地质公司136队.重庆煤炭工业管理局松藻矿务局石壕煤矿生产补克勘探地质报告[R].重庆:四川煤田地质局136队,1996.
  • 10四川煤田地质公司136队.四川省松藻矿区梨园坝井田精查地质报告[R].重庆:四川煤田地质局136队,1987.

共引文献16

同被引文献7

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部