期刊文献+

城市道路过江通道收费策略优化研究 被引量:2

Optimization of Urban River-crossing Traffic Charging Scheme
下载PDF
导出
摘要 城市过江通道BOT收费策略涉及特许期年限、特许期内的交通需求、交通需求的时段差异和计划收费总额.综合考虑这些因素,在收费单价等于基本收费单价与拥挤收费之和的结构下,建立了优化收费策略的一主多从双层规划模型,每一个下层规划为给定基本收费单价条件下一个小时的弹性需求用户均衡模型;上层规划谋求消费者剩余最大化,它受到收费总额达到计划收费总额的约束.该模型将拥挤收费纳入到BOT收费,实现了收费单价的时空差异化.算例分析表明,随着基本收费单价的增长,收费总额呈现出先上升后下降再趋于0的形态,消费者剩余单调下降.收费总额达到计划收费总额的基本收费单价构成一个连续区间. Urban river-crossing traffic charging scheme of BOT contains several factors, which include franchise period, time-vary traffic demand and planning charging amount. Based on these crucial factors, pricing scheme is designed as the sum of basic charge fee and congestion taxes, the bi-level mathematical programming is build up with multiple lower-levels. In this mathematical programming, each lower-lever programming, which adopts users' equilibrium model with elastic traffic demand, represents one identical hour in a day;the upper-level programming maximizes the consumer surplus. In this model, congestion taxes are encapsulated into the river-crossing fee so that the latter could adaptively change with crowding status. Numerical analysis shows that when basic fee increases,the total charging amount will first increase then decrease and approach to zero, and consumer surplus will decrease and approach to zero as well. Such patterns would result in a connected feasible interval of basic fee.
出处 《交通运输系统工程与信息》 EI CSCD 北大核心 2015年第2期163-168,共6页 Journal of Transportation Systems Engineering and Information Technology
关键词 城市交通 过江通道 BOT 收费定价 弹性需求 用户均衡 拥挤道路使用收费 urban traffic river-crossing build-operate-transfer pricing scheme elastic demand user equilibrium congestion taxes
  • 相关文献

参考文献13

  • 1Yang H, Meng Q. Highway pricing and capacity choicein a road network under a build-operate-transfer scheme[J]. Transportation Research, 2000, 34A: 207- 222.
  • 2Yang H, Meng Q. A note on highway pricing and capacity choice in a road network under a build- operate-transfer scheme[J]. Transportation Research, 2002, 36A: 659-663.
  • 3Subprasom K, Chen A. Effects of regulation on highway pricing and capacity choice of build-operate- transfer scheme[J]. ASCE Journal of Construction Engineering and Management, 2007,133 (1): 64-71.
  • 4Anthony Chen, Kitti Subprasom. Analysis of regulation and policy of private toll roads in a build-operate- transfer scheme under demand uncertainty[J]. Transportation Research, 2007, 41A:537-558.
  • 5周晶,陈星光,杨宏伟.BOT模式下的收费道路价格控制机制[J].系统工程理论与实践,2008,28(2):148-152. 被引量:15
  • 6李启明,申立银.基础设施BOT项目特许权期的决策模型[J].管理工程学报,2000,14(1):43-46. 被引量:94
  • 7Yang H, Huang H J. Mathematical and economic theory of road pricing[M]. Oxford: Elsevier, 2005.
  • 8Beckmann M, McGuire C B, Winsten C B. Studies in the economics of transportation[M]. New Haven: Yale University Press, Connecticut, 1956.
  • 9Gartner N H. Optimal traffic assignment with elastic demands: A review part h Analysis framework[J]. Transportation Science, 1980,14: 174-191.
  • 10Gartner N H. Optimal traffic assignment with elastic demands: A review part II: Algorithmic approaches[J]. Transportation Science 1980, 14: 192-208.

二级参考文献13

  • 1Jun Shengli,硕士学位论文,1998年,3-6,11-16,30-37,40-5页
  • 2Shen Liyin,J Construction Engineering Management ASCE,1996年,122卷,4期,319页
  • 3Li Qiming,J Construction,MOC,1994年,7页
  • 4Mills G. Weffare and profit divergence for a tolled link in a road network[J]. Journal of Transport Economics and Policy, 1995, 29 : 137 - 146.
  • 5Verhoef E. The Economics of Regulating Road Transport[ M]. Brokfield: Edwars Elgar, 1996.
  • 6Yang H, Meng Q. Highway pricing and capacity choice in a road network under a build-operate-transfer scheme I J]. Transportation Research-A, 2000, 34:207 - 222.
  • 7Liu, Louie Nan, McDonald John F. Economic efficiency of second-best congestion pricing schemes in urban highway systems[J]. Transportation Research -B, 1999, 33 : 157 - 188.
  • 8Tam C M. Build-operate-transfer model for infrastructure developments in asia: Reasons for successes and failures[J]. International Journal of Project Management, 1999, 17(6) : 377 - 328.
  • 9Tam C M. Features of power industries in southeast Asia[ J]. Intemational Joumal of Project Management, 1995, 13 (5):303 - 311.
  • 10Walker C, Smith A J. Privatized Infrastructure - the BOT Approach[M]. London: Thomas Telford, 1995.

共引文献103

同被引文献15

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部