期刊文献+

有砟轨枕生产线优化改造为双块式轨枕生产线的途径 被引量:3

Ways of Double-block Sleeper Production Line Transformed by Ballasted Sleeper Production Line
下载PDF
导出
摘要 在满足双块式轨枕生产工艺要求的前提下,将有砟轨枕生产线改造为无砟双块式轨枕生产线,并对布料振动成型、脱模、成品堆码等工艺进行了论述,对既有轨枕生产线的改造有一定的借鉴作用。 Double-block sleeper with its comfort, strong integrity, good performance, the geometry of lasting long service life and so on, has been widely used in China, and its production becomes more and more concerned. In order to meet the requirements of double-block sleeper production process, the method for transform the ballasted sleeper production line into double-block sleeper production line is put forward. The vibration moulding, demoulding cloth, finished stacking process is discussed, which plays a positive role for the existing sleeper production line transformation.
机构地区 德阳铁路轨枕厂
出处 《混凝土与水泥制品》 2015年第5期35-37,共3页 China Concrete and Cement Products
关键词 双块式轨枕 生产工艺 生产线改造 Double-block sleeper Production process Production line transformation
  • 相关文献

参考文献3

二级参考文献16

  • 1李军世,李克钏.高速铁路路基动力反应的有限元分析[J].铁道学报,1995,17(1):66-75. 被引量:69
  • 2周华飞,蒋建群.高速列车引起的地基振动[J].岩土工程学报,2006,28(12):2104-2110. 被引量:12
  • 3和振兴,翟婉明.高速列车作用下板式轨道引起的地面振动[J].中国铁道科学,2007,28(2):7-11. 被引量:29
  • 4de Barros F C P, Luco J E. Response of a layered viscoelastic half-space to a moving point load [J]. Wave Motion, 1994, 19: 189-210.
  • 5Dieterman H A, Mertikine A. Critical velocities of a harmonic load moving uniformly along an elastic layer [J]. ASME Journal of Applied Mechanics, 1997, 64: 596-600.
  • 6Jones D V, Le Houedec D, Peplow A T, Petyt M. Ground vibration in the vicinity of a moving harmonic rectangular load on a half-space [J]. European Journal of Mechanics-A/Solids, 1998, 17: 154-166.
  • 7Kaynia A M, Madshus C, Zackris-son P. Ground vibration from high-speed trains: prediction and countermeasures [J]. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 2000, 126(6): 531-537.
  • 8Hall L. Simulations and analyses of train-induced ground vibrations [D]. Stockholm, Sweden: Royal Institute of Technology, 2000.
  • 9Heelis M E, Collop A C, Dawson R D. The ‘Bow-wave’ effect in soft subgrade beneath high speed rail lines [C]. Performance Verification of Constructed Geotechnical Facilities, Geotechnical Engineering Special Publication, 2000: 338-349.
  • 10中华人民共和国铁道部.铁建设[2007]85号客运专线无砟轨道铁路工程施工质量验收暂时标准[S].北京:中国铁道出版社,2007.

共引文献12

同被引文献12

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部