2Dahmen W,Kunoth A,Urban K.Biorthogonal spline wavelet on the interval stability and moment conditions[J].Applied and computational harmonic analysis,1999,6(2):132-296.
8MUNROE C. Construction Cost Estimating.American Society of Professional Estimators[EB/OL].http://www.aspenational.com/CONSTRUC0%20cost%20ESTAMIATI NG.pdf,2009.
9Eastman C,Teicholz P,Sacks R,et a l. B IM handbook:A guide to building information modeling for owners,managers,designers,engineers and contractors[M].NY:John W iley and Sons,2008.