期刊文献+

近距离煤层条采工作面开采设计研究 被引量:1

Mining Design of Partial Extraction Working Face with Close-distance Seam
下载PDF
导出
摘要 对于近距离煤层同时开采两层煤,煤柱的设置关系到煤层压力的稳定。某矿由于煤层距离较近(9m),根据之前煤柱宽度及回采宽度的论证,采取采40m留设30m煤柱的方案。文中结合数值模拟,对该方案的开采关键参数进行了校核,使下层煤条带开采时煤柱塑性区宽度、煤柱垂直应力分布、地表变形均在要求的范围内,为其他同类采区开采设计提供借鉴。 The coal pillar design is relevant to the stability of seam pressure in extracting two levels of coal simul taneously in close--distance seam. According to the demonstration of the original pillar and mining width in the 9--meter--distance coal seam, the paper introduces the mining design of "extracting 40 meters and setting 30-- meter pillar", whose key mining parameters have been verified by numerical simulation with the plastic zone width of pillar, vertical stress distribution of pillar and surface deformation in standard requirements.
作者 张永钢
出处 《江西煤炭科技》 2015年第2期32-34,共3页 Jiangxi Coal Science & Technology
关键词 近距离煤层 条采工作面 开采参数设计 close--distance seam partial extraction working face mining parameter design
  • 相关文献

参考文献6

二级参考文献29

共引文献119

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部