期刊文献+

方钢管混凝土柱-穿筋钢梁节点有限元分析 被引量:1

Finite Element Analysis of Concrete Filled Steel Square Tube Column to Steel Beam with Penetration Rebars
原文传递
导出
摘要 基于大型有限元分析软件ABAQUS,研究在低周反复荷载作用下新型钢管混凝土结构节点——方钢管混凝土柱与钢梁的穿筋节点的力学性能,并将计算值与试验值进行对比,验证非线性分析方法的有效性。建立同时考虑几何非线性、材料非线性的有限元分析模型,分析在低周往复荷载下该节点的破坏模式、承载力、延性及耗能能力等。计算值与试验值吻合度较高,验证了有限元分析模型的准确性,并进一步分析了该节点的力学性能。计算结果发现滞回曲线饱满,位移延性系数理论值介于3.79~4.91,耗能比理论值均大于0.9。新型穿筋节点传力路径明确,延性及耗能能力较好,有限元分析模型能够较好地模拟该节点的力学性能,为进一步研究和改善该节点提供更方便、经济的方法。 Based on large-scale nonlinear FEM analysis software,the mechanical performances of the new joint,under low reversed cyclic loading,which is composed of concrete filled steel square tube column to steel beam with penetration rebar, are reasonably studied in the paper. Considering the geometric nonlinearity, material nonlinearity and contact nonlinearity,the three-dimensional models are established and utilized to analyze failure mode,bearing capacity,ductility and energy dissipation capacity etc. The proposed model of finite element analysis is validated by the comparing with the data from the literature,showing good agreement with experimental results. Furthermore,the mechanical properties of the joints are analyzed by means of proposed models. The numerical results indicate that the displacement ductility index is excellent between 3. 68 ~ 5. 57 and energy dissipation ratios are greater than 0. 9. Compared with the other models,the new column to beam connection has explicit path to transmit the force,better ductility and energy dissipation capacity. The finite element analysis model is well utilized to numerically simulate the mechanical properties of structural members,providing a more convenient and more economic method for further research and improvement of the joints.
出处 《建筑科学》 CSCD 北大核心 2015年第5期81-87,共7页 Building Science
关键词 方钢管混凝土结构 节点 延性 有限元分析 concrete filled steel square tube structure connections ductility finite element analysis
  • 相关文献

参考文献14

  • 1CECS159:2004,矩形钢管混凝土结构技术规程[S].
  • 2Elremaily A, Azizinamini A. Experimental Behavior of Steel Beam to CFT Column Connections[ J]. Journal of Constructional Steel Research, 2001, 57(10): 1099-1119.
  • 3Elremaily A, Azizinamini A. Design Provisions for Connections Between Steel Beams and Concrete Filled Tube Columns [ J ]. Journal of Constructional Steel Research, 2001, 57 (9): 971- 995.
  • 4Chiew S P, Lie S T, Dai C W. Moment Resistance of Steel I- beam to CFT Column Connections [ J ]. Journal of Structural Engineering, 2001, 127 (10) : 1164-1172.
  • 5Beutel J, Thambiratnam D, Perera N. Monotonic Behaviour of Composite Column to Beam Connections [ J ]. Engineering Structures, 2001, 23(9): 1152-1161.
  • 6Beutel J, Thambiratnam D, Perera N. Cyclic Behaviour of Concrete Filled Steel Tubular Column to Steel Beam Connections [ J]. Engineering Structures, 2002, 24 (1): 29-38.
  • 7Johansson M. Composite Action in Connection Regions of Concrete-Filled Steel Tube Columns [ J ]. Steel & Composite Structures, 2003, 3 ( 1 ) : 47-64.
  • 8袁继雄,王湛,荣垂强,陈曦.钢梁-钢管混凝土柱穿心节点力学性能研究[J].工业建筑,2005,35(11):17-20. 被引量:6
  • 9Azizinamini A, Schneider S P. Moment Connections to Circular Concrete-filled Steel Tube Columns E J ]. Journal of Structural Engineering, 2004, 130(2) : 213-222.
  • 10王秀丽,李琼.钢梁贯穿式方钢管砼梁柱节点滞回性能分析[J].兰州理工大学学报,2008,34(3):117-121. 被引量:4

二级参考文献23

共引文献47

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部