摘要 本文主要阐述通过某水电站工程右岸坝基清挖处理过程中,通过爆破网路的改进,大大提高了爆破网路的安全性,可以在保护层开挖过程中,可进行大面积的保护层开挖爆破。采用特殊段别的非电雷管,可以大大减少爆破网路的传爆时间,确保爆破网路的安全,加快了施工进度。 In the dam foundation excavating process on the right bank of a hydropower station, through the improvement of blasting net-work, the safety of the blasting network has been greatly improved, so the large area excavation blasting can be carried in the protection layer excavation process.The application of non electric detonator with special stage can greatly reduce the blasting network detonation time, ensure the safety of blasting network and speed up the construction procedure.
作者 陈双溪
出处 《福建建设科技》 2015年第3期75-76,共2页 Fujian Construction Science & Technology
关键词 某水电站 拱坝、坝基清挖处理 采用 控制爆破 施工 a hydropower station arch dam dam foundation dredging treatment controlled blasting construction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部