期刊文献+

中国实验快堆1台一回路泵切除试验计算模拟与分析 被引量:2

Simulation and Analysis of One Main Pump Trip Test on CEFR
下载PDF
导出
摘要 为检验中国实验快堆(CEFR)发生1台一回路泵切除事件时的安全性,拟在CEFR上进行试验验证。为确保试验的安全性,利用系统分析程序OASIS对试验过程进行了模拟,并对试验可能存在的风险进行了分析。计算结果表明:按照试验步骤进行操作不会对反应堆安全构成威胁;试验初期存在一些风险,源于主热传输系统各回路的流量不匹配问题,可能会对设备产生较大的热冲击。 To verify the safety of China Experimental Fast Reactor (CEFR) under one main pump trip state, a test is going to be performed on CEFR. In order to ensure the safety of reactor, the system code OASIS was applied to simulate the test and analyze the risk existed. The calculation results show that the operation in accordance with the test procedure will not pose a threat to the safety of reactor and the most possible risk derives from the flow rate mismatch problem between main heat transfer systems, which may cause a significant thermal shock to components.
出处 《原子能科学技术》 EI CAS CSCD 北大核心 2015年第B05期283-287,共5页 Atomic Energy Science and Technology
关键词 中国实验快堆 一回路泵切除试验 OASIS程序 模拟分析 China Experimental Fast Reactor main pump trip test OASIS code simulation and analysis
  • 相关文献

参考文献4

  • 1田和春,李泽华,方邦城,等.中国实验快堆最终安全分析报告[R].北京:中国原子能科学研究院,2008.
  • 2DUFOUR P, DO AT J P,PAPIN B. OASIS andCORIANDRE: User friendly and flexible simula-tion tools for FBR’s and PWR’s transient analy-sis[C]//Proceedings of the ENC,90 ENS/ANS-Foratom Conference, France: [s. n, ],1990.
  • 3杨红义.中国实验快堆动态模拟系统的建立[J].原子能科学技术,1999,33(2):108-113. 被引量:5
  • 4杨红义,徐銤.OASIS程序的开发与应用[J].核科学与工程,2001,21(4):322-325. 被引量:10

二级参考文献2

共引文献15

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部