Renovation of the Centennial Hall
Renovation of the Centennial Hall
摘要
The Centennial Hall was designed as a monumental building entirely of reinforced concrete. Soon it became a model for modernist buildings of that era. During the years 2009-2011, the biggest renovation since its completion took place. All activities described in the following paper aimed to put the Centennial Hall into good repair and adjust it to the applicable requirements of modem public buildings. The primary aim is to preserve the authenticity of the original materials used in construction through the use of remedial technologies, thereby maintaining the historical integrity of the building.
参考文献10
-
1Tajchman, J., Schaaf, U., and Bozejewicz, E. 2008. Conservation Documentation Regarding Window Woodwork of Centennial Hall Wroclaw: Wroctawskie Przedsi~biorstwo Hala Ludowa Sp. z o.o.
-
2Persona, M., and Runkiewicz, L. 2009. Expert Report on the Structure's Technical Condition of Building Centennial Hall. Wroclaw: Wroctawskie Przedsi~biorstwo Hala Ludowa Sp. z o.o.
-
3W6jtowicz, R. 2009. Conservation Diagnosis and Examination of the External Wall Colours of the Centennail Hall Wroclaw: Wroctawskie Przedsiqbiorstwo Hala Ludowa Sp. z o.o.
-
4Lagoda, M. 2009. "Technical Opinion Regarding the Reinforcement of the Main Tensile Ring." Expertise thesis, Road and Bridge Research Institute, Wroclaw University of Technology.
-
5Moczko, A. 2010. "Complex Evaluation of Mechanical Parameters of Concrete under the Dome of the Main Ring of the Centennial Hall." Expertise thesis, ConstructionInstitute, Wroclaw University of Technology.
-
6Konarzewski, L., and Persona, M. 2009. Design of Building Facade Renovation of the Centennial Hall. Wroclaw: Wroctawskie Przedsi~biorstwo Hala Ludowa Sp. z o.o.
-
7Tomaszewski, L. 2010. Restoration of the Centennial Hall in Wroclaw, Chapman Taylor International Services. Wroclaw: Wroctawskie Przedsi~biorstwo Hala Ludowa Sp. z o.o.
-
8Sosnal, R., and Kr'42elewski, J. 2009. Temporary Security Trench Using Palisade of Columns DSM and Soilcrate (Jet Grouding)--Specialized Technique of Foundation. Wroclaw: Wroctawskie Przedsi~biorstwo Hala Ludowa Sp. z o.o.
-
9Puta, O. 2009. Technical Opinion Concerning the Deep Excavation inside Centennial Hall. Wroclaw: Wroclawskie Przedsigbiorstwo Hala Ludowa Sp. z o.o.
-
10Prabucki, P., Onysyk, J., Biliszczuk, J., and Madryas, C. 2010. Concept of Strengthening the Main Ring of the Dome in Centennial Hall. Wroclaw: Wroctawskie Przedsi~biorstwo Hala Ludowa Sp. z o.o.
-
1顾征宇.超长钻孔灌注桩的质量控制[J].建筑施工,2004,26(1):23-24. 被引量:4
-
2高峰,张宇.试论断层大体积混凝土施工温度裂缝防护措施[J].建材发展导向,2012(21):89-89.
-
3郭壮,孙秋莹,侯新觉,王倩妮.夯土大学 RIT[J].城市环境设计,2016,0(1):288-289.
-
4张中贞.浅析园林施工中苗木保护技术与补救技术[J].门窗,2014,0(6):108-108.
-
5李先诚.深基坑边坡失稳坑内斜撑补救技术[J].探矿工程(岩土钻掘工程),1998,25(S1):114-115.
-
6《地基处理》征稿简则[J].地基处理,2010,21(1):72-72.
-
7《地基处理》征稿简则[J].地基处理,2009,20(4):72-72.
-
8卢圣飞,王雪晶,张弘帅.浅谈水利工程技术档案的管理和利用[J].水利科技与经济,2005,11(7):397-397. 被引量:3
-
9石转花.加强高速公路工程施工项目竣工资料预管理工作的思考[J].黑龙江档案,2014,0(6):89-89. 被引量:6
-
10李南,刘隽祎.浅谈园林绿化中苗木保护与补救技术的施工要点[J].科技致富向导,2014(23):18-18.