摘要
依托旅大10-1油田现有设施,以降低工程投资为原则,确定了调整后油田消防水系统的工程方案。同时对调整后系统响应时间进行估算及模拟,进行系统可靠性分析,得出该消防水系统的依托方案。该文还提出对项目在后续设计及建造阶段的优化建议,并为日后此类项目提供借鉴。
In this development plan, designer confirmed the fire water system after LD10 -10ilfield Regulation relys on existing fire water system. So, it is necessary to study the reliability analysis of new fire water system for timely response in future. And the optimized design suggestions are afforded for next design stage.
出处
《中国海洋平台》
2015年第2期42-47,共6页
China offshore Platform
关键词
消防水系统
可靠性分析
响应时间
优化建议
fire water system
reliability analysis
timely response
optimization suggestion