期刊文献+

曲弦下承式钢管混凝土桁梁桥改造方案分析 被引量:2

Analysis of Transformation Plan of the Curved Chord Concrete Filled Steel Tubular Truss Bridge
下载PDF
导出
摘要 针对某上跨铁路曲弦下承式钢管混凝土桁梁桥运营中出现桥面变形大的问题,利用桥梁专用软件建立数值分析模型,并结合桥梁静载试验数据,探讨桥面结构变形大的原因;本着少影响下方铁路运行、施工安全可行、节约投资,且能切实改善大桥运营状态的原则,提出简支变连续、加强横撑并增加吊索张拉横梁等措施,对桥面以上部位进行改造,同时对改造步骤给出建议;最后对改造效果进行理论分析.理论分析表明:改造后结构安全,且活载作用下横梁及桥面变形大幅度减小,改造效果显著. In view of the problem of the bridge deck' s large deformation of a curved chord concrete filled steel tubular truss bridge, which is overpass over an electrified main line, bridge analytic software is firstly used to built finite model to analyze the old structure. In combination with static test results, the reason of the bridge deck' s large deformation is discussed. Then in line with some principles of little effect below the railway operation, construction safe and feasible, saving investment, and effectively improving the bridge operation state, the transformation plan is put forward. These plans are structure system transformation, strengthening transverse support and tension sling. The transformation steps are given too. Finally, the effect of transformation is analyzed and evaluated. Through analysis, it shows that structure after transformation is safety and the deformation of the bridge deck and the cross beam is greatly reduced. The effect of transformation is significant.
出处 《郑州大学学报(工学版)》 CAS 北大核心 2015年第2期33-37,共5页 Journal of Zhengzhou University(Engineering Science)
基金 国家自然科学基金资助项目(51408557)
关键词 曲弦下承式钢管混凝土桁梁桥 横梁 竖向变形 改造方案 curved chord concrete filled steel tubular truss bridge cross beam vertical deformation transformation plan
  • 相关文献

参考文献14

二级参考文献535

共引文献621

同被引文献18

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部