摘要
本文对浙北—福州特高压工程典型工况下的的感应电压、恢复电压和潜供电流进行了分析研究,对高抗中性点小电抗的配置提出意见,也为特高压带电作业提供理论依据。
This paper studies and analyzes the induced voltage, recovery voltage and secondary arc current of Zhefu UHV AC power transmission project under typical operational condition. The configuration of neutral reactance is discussed. The simulation result will provide theoretical basis for the live working in UHV project.
出处
《电力与能源》
2015年第2期179-182,共4页
Power & Energy
关键词
浙福特高压
感应电压
恢复电压
Zhefu UHV project
induced voltage
recovery voltage