铁路长大隧道工程概预算编制的探讨 被引量:2

Discussion of Railway Long and Large Tunnel Engineering Budget Preparation
下载PDF
导出
摘要 随着国民经济的发展,我国中西部地区铁路建设速度加快,由于地形原因,建设的长大隧道越来越多。对含辅助坑道的长大隧道施工,依据铁建设"[2010]223号定额"和"[2012]129号定额",是按划分的工区编制概算,还是按隧道全长编制概算,此文根据隧道施工过程和工序以及采用的定额,从隧道开挖、出砟、通风管线路、混凝土和材料运输等方面,结合工程实例,对比分析断面≤90m^2的隧道和断面>90m^2采用机械化施工的隧道,是按工区编制概算还是按隧道全长编制概算合理。经对比分析表明,按工区编制概算符合实际隧道工程造价情况,比较合理。 With the development of national economy, the railway construction in the central and western regions of China speeds up. Due to the terrain, the construction of the long and large tunnel is increasing. For the long and large tunnel contains auxiliary tunnel, the budget preparation is according to division of work ar- ea or tunnel length need be researched. In this article, according to the tunnel construction process and the working procedure and the quota, from the aspects on tunnel excavation, a frantic jumble, ventilation route of pipelines, concrete and material transportation, etc. , combined with the engineering example, the two budget preparation methods are compared in view of the tunnel with section ≤90 m2 and the sec- tion 〉 90 m2. The comparative analysis shows that, the budget preparation according to work area is more reasonable than that according to the tunnel length.
作者 陈天宇
出处 《铁路工程造价管理》 2015年第3期17-20,35,共5页 Railway Engineering Cost Management
关键词 铁路工程 长大隧道 概算编制方式 对比分析 Railway engineering Long and large tunnel Budget preparation mode Comparison and analysis
  • 相关文献

参考文献6

二级参考文献10

共引文献28

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部