摘要
结合尼日利亚阿夸依博州埃科特19公里公路项目工程案例,对工程软基处理方法进行了分析,阐述了挡堰回填法及先压后挖清淤法的施工技术,总结了施工中各阶段的技术要点,以取得良好的施工效果。
Combining with the engineering case of Nigeria-Akwa Bozhou Eckert 19 km project, this paper analyzed the engineering soft foundation process method, elaborated the construction technology of weir back-fill method and first pressure after digging dredging method, summarized the technical points of each stage in construction, in order to obtain good construction effect.
出处
《山西建筑》
2015年第16期160-161,共2页
Shanxi Architecture
关键词
软基处理
挡堰回填法
先压后挖清淤法
soft foundation treatment, weir back-fill method, first pressure after digging dredging method