为了保证南水北调工程施工完成后能够安全顺利工作运营,在工程竣工后还需要对南水北调整体工程进行连续多次的变形监测,通过实时获取变形体的动态位移信息来预警变形体的安全状况。能够及时解决发现的问题,以免给北方地区人民生活带来不便。针对南水北调中线工程潮河段,通过参照业主的招标要求与变形监测行业标准,对南水北调中线潮河段渠道与建筑物的变形监测方法进行探讨、设计,运用高精度仪器,力求达到最佳监测方案,以供业内人士进行交流与借鉴。
In order to ensure the safe completion of the construction of water diversion project work smoothly operate after completion of the project as a whole also needs to diversion works repeatedly deformation monitoring , access to information on the dynamic displacement of the deformable body to safety through real-time status of warning deformable body.Able to deal with problems found , so as to avoid the inconvenience of living in northern regions.North Water Transfer Project for the tidal riv-er, by referring to the owners of the tender requirements and industry standards deformation monito -ring explore , design tidal river channels on North Water Transfer and deformation monitoring methods of the building , strive to achieve the best monitoring program in order to communicate and learn from industry insiders.
出处
《水利科技与经济》
2015年第5期8-10,共3页
Water Conservancy Science and Technology and Economy
关键词
南水北调
监测
原则
布置
精度
设计
south to north water transfer
monitor
principle
layout
accuracy
design