期刊文献+

南水北调中线沙河渡槽施工期三维有限元分析 被引量:3

Three-dimensional Finite Element Analysis on the Shahe Aqueduct Construction Period of South to North Water Diversion Project
下载PDF
导出
摘要 本文主要是采用三维有限元技术,建立了大流量预应力矩形渡槽有限元模型,考虑结构自重、预应力、风载、水载对渡槽的影响,按水工混凝土结构设计规范(SL 191-2008)要求,对南水北调中线工程的沙河渡槽在合理工况组合下的施工期进行了仿真计算,得出控制点在各外载作用下的应力及变形结果,为预应力矩形渡槽施工期的设计提供一定的理论依据。 This paper mainly used three-dimensional finite element technique, established large flow finite element model of prestressed rectangular aqueduct, considering the impacts of the structural weight, prestress, wind load, wa- ter load on the aqueduct, according to the structural design specifications of hydraulic concrete, simulated and calcu- lated the construction period under reasonable working conditions combination of Shahe Aqueduct in South to North Water Diversion Project, stress and deformation results of the control point under the action of various external load- ing were obtained. It provided a theoretical basis for the design of prestressed rectangular aqueduct in construction period.
作者 卢军燕 李慧
出处 《河南科技》 2015年第3期49-51,共3页 Henan Science and Technology
关键词 沙河渡槽 预应力 施工期 仿真计算 Shahe aqueduct prestress construction period simulation and calculation
  • 相关文献

参考文献3

二级参考文献8

  • 1叶朋月,李元,张超锋.预应力混凝土渡槽结构三维有限元分析[J].四川水力发电,2005,24(B12):12-16. 被引量:6
  • 2天津大学 同济大学 等.混凝土结构[M].北京:中国建筑工业出版社,1994..
  • 3[1]中华人民共和国水利部.SL/T191-96水工混凝土结构设计规范[S].北京:水利水电出版社,1997.
  • 4[2]中华人民共和国.SL94-96水利水电预应力施工规范[S].北京:中国水利水电出版社,1997.
  • 5白新理,等.南水北调工程建设重大关键技术研究及应用(JGZXJJ2006-10):大型渡槽施工和运营期动态跟踪、温度荷载及动力分析研究报告[R].华北水利水电学院,北京交通大学,南水北调工程建设监管中心,2007.
  • 6DL 5077-1997,水工建筑物荷载设计规范[S].北京:中国电力出版社,1977.
  • 7王森林,郝文秀,徐晓,王蕾,魏建国,刘爱军.洺河渡槽结构静力分析[J].河北农业大学学报,2002,25(4):152-154. 被引量:4
  • 8赵瑜,白新理,原小杰,刘宪亮,刘东常.东深供水改造工程渡槽支承结构受力分析[J].灌溉排水,2002,21(3):53-55. 被引量:5

共引文献3

同被引文献22

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部