摘要 武汉绿地项目高636m,基坑深25.5m,有5道环形水平支撑,地下室钢结构施工包括6个型号为SC1的巨型钢柱、6个型号为SC2的巨型钢柱和3节剪力墙钢骨。在地下室钢结构施工阶段,使用1台M1280D进行吊装时,有4个SC1巨型钢柱用M1280D塔吊吊装不到,需要使用3 000kN履带吊在水平支撑平台上进行吊装。通过对工程有限元分析和合理地安装措施,避免了对环形水平支撑的加固并顺利进行吊装,为项目节约了成本。 The depth of the deep excavation for Wuhan Greenland Project (636 m) is 25.5 m, which has five passes of circular horizontal supports. The construction of basement steel structure contains six SC1 giant steel columns, six SC2 giant steel columns and three steel skeleton sections of shear wall, in construction stage of the basement steel structure, when using a M1280D hoist, four SC1 giant steel columns could not be hoisted, so a 3 000 kN crawler crane was used to do the hoisting on a horizontal support platform. Through the finite element analysis and reasonable installation measures for the project the reinforcement of circular horizontal support was avoided, which saved the cost for the proiect.
出处 《钢结构》 北大核心 2015年第5期88-89,87,共3页 Steel Construction
基金 省部级课题"中国建筑千米级摩天大楼建筑研究"(CSEEC-2010-05E-01-5-03)
关键词 履带吊 有限元分析 临时支撑结构 水平支撑 crawler crane finite element analysis temporary support structure horizontal support
  • 相关文献

参考文献5

  • 1王俊杰,郝际平,郑江,钟炜辉,徐重良.大型履带吊车行走处楼板加固计算分析[J].工业建筑,2008,38(10):118-120. 被引量:8
  • 2徐重良、党保卫.大型履带吊在地下室顶版面上作业与加固技术[J].施工技术,2008,37(5):256-258.
  • 3GB50010--2010混凝土结构设计规范[S].
  • 4GB50017-2003.钢结构设计规范[S].[S].,2003..
  • 5GB50009-2012,建筑结构荷载规范[S].2012.

二级参考文献3

  • 1魏成权,高干.大型履带吊车行走路线加固技术[J].施工技术,2007,36(2):89-90. 被引量:7
  • 2JGJ130-2001.建筑施工扣件式钢管脚手架安全技术规范.[S].,..
  • 3尚晓江,邱峰,等.ANSYS结构有限元高级分析方法与范例应用.北京:中国水利水电出版社,2005.

共引文献2279

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部