摘要
大庆油田进入高含水阶段,水驱开发矛盾日益突出,本文通过对水驱精细调整示范区主要矛盾进行分析,合理优化措施方案,可为高含水后期有效的措施挖潜提供技术支撑。
Daqing Oilfield has entered high water cut stage,water flooding development contradictions have become increasingly prominent,the analysis on water flooding fine adjustment demonstration zone are carried out in this paper and provide technical supports for future technical upgrades.
出处
《石化技术》
CAS
2015年第4期76-77,共2页
Petrochemical Industry Technology
关键词
水驱
压裂
方案优化
water flooding
fracturing
scheme optimization