以雅砻江锦屏二级水电站为例,总结了超长大容量引水发电系统水力过渡过程物理模型试验研究成果,对比分析了真机甩负荷实测成果与数值仿真成果,验证了水力过渡过程数值仿真的准确性,提出了超长大容量引水发电系统运行控制优化技术及应用成果,以期相关成果能为今后类似工程建设、设计和研究工作提供有益参考。
Taking Jinping Ⅱ Hydropower Station as an example, the research findings of physical model test on hydraulic transition process for complicated, long and large water diversion and power generation system are presented, and the reliability of numerical simulation technology is verified by comparing calculation results against measured results of prototype. The operation optimization and research application for complicated, long and large water diversion and power generation system are also proposed based on research results to provide useful references for the construction of similar projects in the future.
出处
《水力发电》
北大核心
2015年第6期98-101,共4页
Water Power
关键词
引水发电系统
水力过渡过程
数值仿真
运行优化
water diversion and power generation system
hydraulic transition process
numerical simulation
operation optimization