摘要
分析了吉隆坡安邦轻轨延伸线项目道床施工在道床型式、焊轨严格等客观因素影响下采用常规模式难以施工的情况下,经过多次不断优化,最后得出了最佳方案并得以顺利实施。论文探讨了该方案执行的思路,以供参考。
This thesis analyzes track plinth construction which is hard to be constructed by conventional method due to special plinth type, strict welding and other objective factors, but finally obtained the best solution and implementing smoothly by optimizingconstantly. This method will be discussed below for reference.
出处
《工程建设与设计》
2015年第6期147-149,152,共4页
Construction & Design for Engineering
关键词
道床轨排架
L墙长轨直铺
施工
track plinth track frame
derail wall Long rail laying straightly
construction