期刊文献+

重庆黑石子垃圾场调节池清淤改造设计与实施 被引量:1

The dredging transformation design and implementation of Chongqing Heishizi refuse landfill regulation pool
下载PDF
导出
摘要 重庆黑石子垃圾填埋场调节池池体由于防渗系统遭到损坏,需要对调节池进行清淤和池体改造,经方案比选后确定采用吸污泵绞吸工艺进行清淤,池体改造设计则采用钢筋混凝土结构+HDPE膜调节池,池体为钢筋混凝土结构,池内壁及底部铺设2.0 mm厚HDPE土工膜,满足设计要求。 The Chongqing Heishizi refuse landfill regulation pool due to the seepage control system was damaged,need to make dredging and pool body transformation to regulating pool,through the scheme comparison determined using the sewage sucking pump cutter suction process to dred-ging,the pool body design and transformation using reinforced concrete structure = HDPE membrane regulation pool,the pool body as the rein-forced concrete structure,the pool inner wall and bottom laying of 2. 0 mm thick HDPE geomembrane,meet the design requirements.
出处 《山西建筑》 2015年第17期205-206,共2页 Shanxi Architecture
关键词 垃圾填埋场 调节池 污泥 清淤 池体改造 refuse landfill regulation pool sludge dredging pool transformation
  • 相关文献

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部