期刊文献+

全段高组合凿岩爆破技术在会宝岭铁矿的应用 被引量:1

Application of Combined Drilling and Blasting Technology with Entire Sublevel Height in Huibaoling Iron Mine
下载PDF
导出
摘要 介绍会宝岭铁矿中深孔分段空场和高阶段大直径深孔联合回采工艺技术,与采用单一中深孔分段空场法形成对比,对较厚矿体采用全段高组合凿岩爆破技术,实现安全、高效开采,提高资源回收率,技术经济效果明显。 The combination mining technology of sublevel open stope and high-level large-diameter long hole mining in Huibaoling Iron Mine is described, and compared to the single medium length hole sublevel open stope method, for the thick ore body the safe and efficient mining is achieved, the recovery rate of resources is increased, and the technical and economic index is largely improved by combined drilling and blasting technology with entire sublevel height.
作者 刘允秋
出处 《有色金属工程》 CAS CSCD 北大核心 2015年第B05期120-122,共3页 Nonferrous Metals Engineering
关键词 大直径深孔 组合凿岩爆破 全段高 侧向崩矿 凿岩硐室 尾砂非胶结充填 large diameter deep hole combined drilling and blasting entire sublevel height lateral caving drilling chamber tailings non-cemented filling
  • 相关文献

参考文献5

二级参考文献11

共引文献55

同被引文献24

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部