期刊文献+

Evaluation of the impact of commodity price change on mine plan of underground mining 被引量:2

下载PDF
导出
摘要 Fluctuations in commodity prices should influence mining operations to continually update and adjust their mine plans in order to capture additional value under new market conditions. One of the adjustments is the change in production sequencing. This paper seeks to present a method for quantifying the net present value(NPV) that may be directly attributed to the change in commodity prices. The evaluation is conducted across ten copper price scenarios. Discrete event simulation combined with mixed integer programming was used to attain a viable production strategy and to generate optimal mine plans. The analysis indicates that an increase in prices results in an increased in the NPV from$96.57M to $755.65M. In an environment where mining operations must be striving to gain as much value as possible from the rights to exploit a finite resource, it is not appropriate to keep operating under the same mine plan if commodity prices alter during the course of operations. Fluctuations in commodity prices should influence mining operations to continually update and adjust their mine plans in order to capture additional value under new market conditions. One of the adjust-ments is the change in production sequencing. This paper seeks to present a method for quantifying the net present value (NPV) that may be directly attributed to the change in commodity prices. The evaluation is conducted across ten copper price scenarios. Discrete event simulation combined with mixed integer programming was used to attain a viable production strategy and to generate optimal mine plans. The analysis indicates that an increase in prices results in an increased in the NPV from$96.57M to $755.65M. In an environment where mining operations must be striving to gain as much value as possible from the rights to exploit a finite resource, it is not appropriate to keep operating under the same mine plan if commodity prices alter during the course of operations.
出处 《International Journal of Mining Science and Technology》 CSCD 2015年第3期375-382,共8页 矿业科学技术学报(英文版)
  • 相关文献

参考文献3

二级参考文献54

  • 1Whittle J. The Facts and fallacies of open pit optimization. Whittle Programming Pty Ltd 1989.
  • 2Osanloo M. Gholamnejad J. Karimi B. Long-term open pit mine production planning: a review of models and algorithms. Int J Min Reclam Environ 2008;22:3-35.
  • 3Vallee M. Mineral resource+engineering, economic and legal feasibility=ore reserve. CIM Bull 2000;90:53-61.
  • 4Koushavand B. Askari-Nasab H. Transfer geological uncertainty through mine planning. MPES. MPES-International Symposium of Mine Planning/Equipment Selection 2009.
  • 5Dowd PA. Risk assessment in reserve estimation and open-pit planning. Trans Inst Min MetaIl1994;103:A148-54.
  • 6Ravenscroft PJ. Risk analysis for mine scheduling by conditional simulation. Can Min Metall Bull 1992;101:82-8.
  • 7Ramazan S. Dimitrakopoulos R. Traditional and New MIP Models for Production Scheduling With In-Situ Grade Variability. 2004;18:85-98.
  • 8Godoy M. Dimitrakopoulos R. Managing risk and waste mining in long-term production scheduling of open pit mine. SME Ann Meet Exhib 2003;316:43-50.
  • 9Leite A. Dimitrakopoulos R. Stochastic optimisation model for open pit mine planning: application and risk analysis at copper deposit. Trans Inst Min Metall 2007;116:109-18.
  • 10Dimitrakopoulos R, Ramazan S. Stochastic integer programming for optimising long term production schedules of open pit mines: methods, application and value of stochastic solutions. Min Technol 2008;117: 155-60.

共引文献21

同被引文献9

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部