基于预应力法的埋地管道固定支墩设计

Design of Buried Pipeline Fixed Buttress Based on the Prestressed Method
下载PDF
导出
摘要 地下管道的轴向力对管道系统的危害较大,产生的轴向应变会对管道系统造成破坏,减小这一影响的方法是采用固定墩,但固定墩的体积往往很大,增加了管道系统的成本和施工难度。以往对于解决地下管道固定墩体积过大问题的通用方法是借助地基原状土的抗力,将支墩设计成异型支墩,但这种方法对于土质情况的准确把握较困难,同时现场地质条件制约的因素较大,计算起来也较复杂。提出预应力处理法,通过对管道的预处理,达到减小管道轴向力和倾覆力矩的影响,实现科学、简便施工设计的目的。 Underground pipeline axial force has big harm to the pipe system, produced axial strain will damage the piping system. The method to reduce the influence is to adopt the fixed piers, but the volume of a fixed pier is often large, building the pier will increase the cost of the pipeline system and construction difficulty. In the past, in order to solve the problem that underground pipe fixed block size is too large, common method is to design special-shaped piers with the help of the undisturbed soil resistance, but this method asks an accurate grasp of the soil conditions, which is more difficult, at the same time the field geological conditions have larger restraint on the method, and the calculation is relatively complex. In this paper, prestressed treatment method was put forward. After the pretreatment of the pipeline, the effect of axial force and overturning moment can be decreased to realize the objective of scientific and simple construction design.
出处 《当代化工》 CAS 2015年第5期1149-1151,共3页 Contemporary Chemical Industry
关键词 固定墩 预应力 地下管道 Fixed pier Prestressed Underground pipeline
  • 相关文献

参考文献5

二级参考文献14

  • 1马贵阳,刘晓国,郑平.埋地管道周围土壤水热耦合温度场的数值模拟[J].辽宁石油化工大学学报,2007,27(1):40-43. 被引量:44
  • 2李长俊.埋地输油管道的热力计算[J].西南石油学院学报,1997,19(1):79-83. 被引量:21
  • 3Wheeler J A. Simulation of heat transfer from a warm pipeline buried in permafrost. AICHE 74 national meeting [C]. New Orleans:[s. n.], 1973.
  • 4Weon-Keun Song. Thermal transfer analysis of unpaved and paved freezing soil media including buried pipelines[J]. Numerical heat transfer,2005,48(6):567- 583.
  • 5Yu B, Wang Y, Zhang J J, et al. Thermal impact of the products pipeline on the crude oil pipeline laid in one ditch - The effect of pipeline interval[J]. Int. j. heat and mass transfer,2008,51(3-4).597-609.
  • 6Bau Haim H, Sadhal S S. Heat losses from a fluid flowing in a buried pipe[J]. Int. j. heat and mass transfer, 1982,25 (11) . 1621 -1629.
  • 7Himasekhar K, Bau Haim H. Thermal convection associated with hot/cold pipes buried in a semi-infinite, saturated, porous medium[J]. Int. j. heat and mass transfer,1987,30(2).263-273.
  • 8Chung M, Jung P S,Rangel R H. Semi-analytical so-lution for heat transfer from a buried pipe with convection on the exposed surface[J].Int. j. heat and mass transfer,1999,42(20):3771-3786.
  • 9GB50316-2000.工业金属管道设计规范.[S].,..
  • 10叶康民.金属腐蚀与防护概论.北京:高等教育出版社,1995

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部