期刊文献+

高铁连续梁收缩徐变及长期挠度变化研究 被引量:15

Research on the Shrinkage and Creep and Changes of Long- term Deflection of High- speed Rail Continuous Beam
下载PDF
导出
摘要 研究目的:高铁连续梁成桥后,随着时间的推移,由于收缩徐变的影响,连续梁的挠度会不断变化,影响收缩徐变的年相对湿度、加载龄期、收缩徐变系数等都会不同程度的影响桥梁的长期挠度。为研究混凝土的徐变与收缩对大跨度桥梁的变形和内力影响程度,选择逼近实际的徐变和收缩分析模式,合理地进行徐变、收缩效应分析从而正确地考虑徐变与收缩的影响非常必要。研究结论:(1)相对湿度减小,长期挠度增加,对保证成桥线形是不利的,因此增加相对湿度,如采用蒸汽养护等措施对桥梁的长度挠度有减小的作用,有利于保持桥梁的成桥线形;(2)桥梁的加载龄期较短,长期挠度也将有所增加,因此在施工过程中,限制施工荷载过早的加载于新浇筑梁段可以减低长期挠度;(3)徐变系数对桥梁的长期挠度产生很大影响,徐变系数增大,桥梁的长期挠度增加,选取适当的徐变系数对预测桥梁的长度挠度有着十分重要的作用,因此在重要性桥梁设计中,采取试验等措施确定徐变系数是必要的;(4)本研究结论对高铁连续梁的施工和预拱度的计算具有指导意义。 Research purposes: When continuous beam of high - speed railway is completed, with the passage of time, because of the influence of shrinkage and creep, continuous beam deflection will keep changing. The long - term deflection of the bridge will be affected in different degrees by relative humidity, loading age, shrinkage and creep coefficient. In order to study the influence of the creep and shrinkage of concrete on deformation and internal force of long span bridges, this paper chooses approach practical analysis pattern of creep and shrinkage, reasonably conducts analysis of creep and shrinkage effect, it is very necessary to properly think over the influence of shrinkage and creep. Research conclusions:( 1 ) The relative humidity reducing, the long -term deflection increasing, are disadvantageous to ensure the bridge line, so increasing the relative humidity, such as the use of steam curing measures has a decreasing effect for the length of deflection of the bridge, is beneficial to keep the bridge line of the bridge. (2) The short loading age of the bridge will also increase long - term deflection, so in the construction process, limiting construction load early in the new pouring of beam section, can reduce the long- term deflection. (3) Creep coefficient has a great effect on the long- term deflection of the bridge, creep coefficient increases, the long- term deflection of the bridge increases, selecting the appropriate creep coefficient is pretty important for predicting the length of the deflection of the bridge, so it is necessary to determine the creep coefficient by taking the test measures in the design of important bridge. (4) This research conclusion has a guiding significance for the construction and pre - camber calculation for the high - speed railway continuous beam.
出处 《铁道工程学报》 EI 北大核心 2015年第5期49-53,共5页 Journal of Railway Engineering Society
关键词 高铁 连续梁 悬臂施工 收缩徐变 长期挠度 high - speed railway continuous beam cantilever construction shrinkage and creep long - term deflection
  • 相关文献

参考文献3

二级参考文献9

  • 1孔德艳.预应力混凝土简支梁徐变上拱的控制研究[D].兰州:兰州交通大学,2005.
  • 2Z. P. Bazant. Prediction of concrete creep and shrinkage: past, present and future[J ]. Nuclear Engineering and Design, 2001 (20) :3.
  • 3A. M. Neville, W. H. Dilger, J. J. Brooks. Creep of plain and structural Concrete, Construction Prrss [ J ]. London and New York, 1983( 1 ) :27-28.
  • 4AASHTO.美国公路桥梁设计规范[M].幸济平,译.北京:人民交通出版社,1994.
  • 5[苏]A·E·谢依金.水泥混凝土的结构与性能[M].胡春芝,译.北京:中国建筑工业出版社,1984:5.
  • 6J. M. Hohberg. Creep of structural Concrete, Influencing Factors and their Implementation in Predietion[J ]. Berlin, 1978 (1):43-44.
  • 7[日]岩崎训明.混凝土的特性[M].尹家辛,译.北京:中国建筑工业出版社,1980:12.
  • 8TB 10002.3-99,铁路桥涵钢筋混凝土及预应力混凝土设计规范[S].
  • 9徐郁峰,苏成,王卫锋,韩大建.崖门大桥收缩、徐变效应的计算与分析[J].桥梁建设,2003,33(1):43-47. 被引量:10