摘要
拱坝混凝土浇筑仓层厚度是影响拱坝混凝土施工质量和进度的关键因素之一,混凝土浇筑仓层厚度高度的突破面临温控防裂、三大高差控制和体型控制等一系列挑战,但同时也可以为工程建设带来巨大的进度和经济效益。针对锦屏一级特高拱坝混凝土施工采用4.5m仓层厚度时的关键技术问题开展研究,研究成果工程应用效果显著,可为其它高拱坝筑坝时面临的类似问题提供技术借鉴。
The warehouse layer thickness of pouring concrete arch dam is one of the key factors affecting the construction quality and progress. The breakthrough of the height of warehouse layer thickness of pouring concrete faces a series of challenges including the temperature control and crack prevention, three height difference control, and body control, but it also provides the tremendous progress and economic benefits for the construction. In this paper,the key construction techniques of the 4.5-m thick warehouse layer of Jinping level I super high concrete arch dam were investigated. The research results can provide technical support for similar projects in future.
出处
《南水北调与水利科技》
CAS
CSCD
北大核心
2015年第3期580-584,592,共6页
South-to-North Water Transfers and Water Science & Technology
关键词
特高拱坝
4.5m仓层厚度
体型控制
温控防裂
施工进度
super high concrete arch dam
4. 5-m thick warehouse layer
body control
temperature control and crack prevention
construction progress