期刊文献+

中国核电调试标准体系研究及标准判定原则探讨 被引量:2

The Study on Commissioning Standard System of Nuclear Power Plant in China
下载PDF
导出
摘要 我国核电调试领域标准已从零散、不完整、不系统逐步发展为较为完整和系统的调试标准体系,并形成了较为完善的核电调试标准体系表。首先对国内近10年核电调试领域标准建设情况进行了回顾,再结合核电调试的特点及国内现状,提出了对现有调试标准体系的修改建议,最后对核电调试标准存在的合理性和必要性提出了判定原则,为中国核电调试标准体系建设提供参考。 Inrec ent years, the Commissioningstandard system ofnuclcar power plant in china has changed from non-systemic, incomplete to systemie and complete, and commissioningstandardlist could cover the sdandard systembasically. Firsdy, the construction of nuclear power plant commissioning standard in recent 10 years in china is retrospected. And then combining withthe chracteristics of the nuclearpowerplant commissioningand the siatus in c hina, some suggestions ofmodity, the current commissioning sdandard system are Nven. Finally, the principles ofnecessity and reasonability to the existence ofcommissioningsdandard are proposed.
出处 《科技风》 2015年第10期29-30,共2页
基金 重大科技专项支持(编号:2012ZX06004-001)
关键词 压水堆核电 调试 标准体系 判定原则 nuclearpowerplant commissioning sdandardsystem ExistencePrinciple
  • 相关文献

参考文献6

  • 1科工二司[2007]1053号:国防科工委关于印发《压水堆核电厂标准体系建设“十一五”规划》的通知.
  • 2国家能源局与国家标准化管理委员会关于联合发布《压水堆核电厂标准体系建设规划》的通知.
  • 3国能科技[2009]274号:国家能源局关于发布《压水堆核电厂标准体系项目表》和《核电标准建设工作规则.的通知.
  • 4国能科技[2012]5号:国家能源局关于发布《压水堆核电厂标准体系项目表2011年修订版》的通知.
  • 5国能科技[2014]265号:国家能源局关于发布《压水堆核电厂标准体系项目表(2013年修订版)》 的通知.
  • 6顾申杰,田林,尚恒.中国核电标准体系建设思考[J].核标准计量与质量,2011(4):26-34. 被引量:8

二级参考文献3

共引文献7

同被引文献7

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部