期刊文献+

核电相关管理技术用于火电以提升机组可靠性的分析 被引量:3

Analysis on Thermal Power Plant Units Reliability Improvement by Nuclear Power Related Management Technology
下载PDF
导出
摘要 在介绍核电机组的设备管理和人因管理方法或体系基础上,结合江苏火电机组近年来的的非计划停运现状,介绍了如何借鉴核电的管理方法和经验制定提高火电机组运行可靠性的策略,包括日常设备管理、大修设备管理、人因可靠性管理三方面,以期提高火电企业安全生产管理水平,减少人和管理等原因造成的非计划停机,提高设备可靠性。 After decades of development, China's nuclear power generating unit reliability has been greatly improved. The equipment management and human factor management countermeasures and practice for improving the reliability of unit taken by the nuclear power is introduced in this paper. On the basis of the analysis of the unscheduled shutdown of the status quo of thermal power unit in recent years, strategies to enhance the reliability of generator equipment are proposed. Drawing lessons from the nuclear power industry management experience can promote the production management of thermal power generation enterprises and reduce the times of unscheduled shutdown.
出处 《江苏电机工程》 2015年第1期81-84,共4页 Jiangsu Electrical Engineering
关键词 核电 火电 设备管理 人因 可靠性 nuclear power thermal power equipment management human factor, reliability
  • 相关文献

共引文献5

同被引文献12

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部