压水堆反应堆压力容器密封主螺栓预紧过程模拟 被引量:3

Simulation of Bolt-up Process for Seal Main Bolts of PWR Pressure Vessel
下载PDF
导出
摘要 建立了我国自主压水堆反应堆压力容器分析模型,采用通用结构分析软件ABAQUS对密封主螺栓的预紧过程进行了模拟分析。通过计算,可以得到螺栓载荷的变化、上下法兰的变形过程,从而判断螺栓加载荷顺序和大小是否合理。对于一回路压力容器的密封预紧操作具有很好的参考价值。 The reactor pressure vessel of self-owned pressure water reactor (PWR) is built, and the bolt-up process for main bolts is analyzed in this paper. According to the calculation, the change of the pre-load on the bolts and the deformation of the main flange can be checked, and a lot of useful conclusions can be got, such as whether the bolt-load of every step is good or not, whether the bolt groups are good or not. The simulation results of this paper are very meaningful for the bolt-up process operation of the first loop pressure vessel.
作者 陈宝
出处 《液压气动与密封》 2015年第6期13-15,共3页 Hydraulics Pneumatics & Seals
关键词 压水堆 压力容器 密封 主螺栓 预紧过程 PWR pressure vessel seal main bolts bolt-up
  • 相关文献

参考文献5

二级参考文献13

共引文献25

同被引文献14

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部