摘要 由于城市建设与铁路事业的发展,导致临近高铁路线的工程日益增多,此类工程的基坑施工会对临近高铁产生影响,然而运营期的高铁对于变形控制极为严格。为了确保铁路运营安全,针对这种现象,以某中压燃气管线保护涵下穿大西高铁桥梁为背景,建立三维数值仿真分析模型,对基坑施工全过程进行分析模拟。得到以下结论:基坑防护桩施打结束以后,临近高铁桥墩总沉降值达到最大;"开挖至坑底"施工阶段对各桥墩竖向变形及水平变形影响最大,该阶段结束时高铁桥墩产生最大的附加水平变形和附加不均匀沉降。 Because of the urban construction and railway development, crossing phenomenon give rise to more and more adjacent-railway project. The foundation pit excavation of such projects can lead to an influence on high-speed railway close to it. Deformation control of operating high-speed railway is very strictly. To ensure the operation safety, in view of this appearance, this essay erects a 3D numerical simulation and analysis mod- el based on one mid-pressure gas pipeline culvert underpass DAXI high-speed railway bridge. And the whole construction process of the foundation pit is simulated. The following conclusions are obtained: the whole set- tlement of the adjacent pier achieves maximum when the fender pile construction comes to an end; the "exca- vation to the bottom" construction step influence the vertical and horizontal deformation most. At the end of this stage, maximum additional horizontal deformation and vertical additional uneven settlement emerge.
作者 齐成龙 张军
出处 《河南城建学院学报》 CAS 2015年第2期26-30,共5页 Journal of Henan University of Urban Construction
关键词 基坑 高铁桥梁 防护桩 有限元 变形 沉降 foundation pit high-speed railway bridge fender pile finite element deformation settlement
  • 相关文献

参考文献7

二级参考文献12

共引文献108

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部