龙口水力计算在漩门三期围垦工程置换龙口合龙中的应用 被引量:1

Application of Closure Gap Hydraulic Calculation in the Replacement Gap Closure of the Third Phase Reclamation Project of Xuanmen
下载PDF
导出
摘要 漩门三期围垦工程规模大,涂面深,海堤基础采用爆炸挤淤置换法进行处理,龙口设计采用置换龙口的型式。置换龙口的形成和合龙不同于塑料排水插板等地基处理的常规龙口。针对置换龙口的设计,进行大量的龙口水力要素计算,分析、研究影响置换龙口合龙的关键因素,以确定爆炸推进控制、置换口门开挖的方式及时间,获得"置换龙口"成功合龙。 The third phase reclamation project of Xuanmen is large-scale with deep coating .The explosion sludge-extruding displacement method is adopted to deal with the seawall foundation ,and replace-gap reclamation is used to design closure gap . The formation and closure of gap replacement are different from plastic drain flapper or other conventional closure of foundation treatments .In views of closure gap replacement design , this paper made a large amount of calculation about its hydraulic elements ,and analyzed the key factors influencing closure gap replacement .Then the paper determined the way and time of explosion propulsion control and replacement entrance excavation to realise succussful closure of gap replacement .
出处 《浙江水利科技》 2015年第3期43-46,共4页 Zhejiang Hydrotechnics
关键词 置换龙口 合龙 水力计算 水力要素 closure gap replacement closure hydraulic calculation hydraulic elements
  • 相关文献

参考文献4

二级参考文献7

共引文献1

同被引文献15

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部