东莞市芦村旧排站主要电气设备有6台130 k W低压电动机、3台变压器、2台配电柜和6台启动柜,经过几十年的运行,设备老化严重,经过现场安全检测,技术指标不能满足要求,应进行更新改造。
The main electrical equipments includes 6 low voltage motor of 130kW, 3 transformers, 2 sets of power distribution cabinet and 6 starting cabinet in Lucun Old Pumping Station .After decades of operation , equipments are aging seriously , through on-site safety detection , technical indicators can 't meet the requirements , so they should be carried out renovation .