摘要
为确保电站大坝的安全运行,根据《蓬辣滩水电站安全隐患排查及风险评估报告》中工程安全监测结论与建议,针对蓬辣滩水电站大坝安全监测系统存在的问题及工程实际情况,进行了技术改造设计。
According to Report on Safety Troubles Elimination and Risk Assessment of Penglatan Hydro -junction, in order to ensure the operation safety of dams , technical transformation design has been made on the case of problems in the dam safety monitoring system of Penglatan hydro -junction.
出处
《广东水利水电》
2015年第3期48-51,共4页
Guangdong Water Resources and Hydropower
关键词
蓬辣滩水电站
大坝安全监测
技术改造
Penglatan hydro -junction
dam safety monitoring
technical transformation