期刊文献+

阳江抽水蓄能电站移民生产安置方案的探讨

Production Settlement Plan for Yangjiang Pumped Storage Power Station
下载PDF
导出
摘要 依据国家有关政策,结合阳江抽水蓄能电站的实际情况。以被征收耕地净产值为基础,制定移民生产安置目标值,提出有土安置和投资阳春市自来水公司生产安置方案。通过论证,推荐投资阳春市自来水公司作为移民安置方案,为保障移民投资收益的稳定性,建议当地政府作为投资主体和实施主体。 According to the relevant state policies , combining with the actual situation of Yangjiang pumped storage power station , based on the net output of cultivated land , production settlement target has been worked out , and solutions of agricultural production and investment Yangchun Water Company have been developed .Through argumentation , investment in Yangchun Water Company has been recommended as resettlement plan .In order to guarantee the stability of the immigrant investment income , local government investment and operation are suggested .
出处 《广东水利水电》 2015年第3期64-66,共3页 Guangdong Water Resources and Hydropower
关键词 蓄能电站 移民 生产安置 探索 Pumped Storage Power Station production settlement develop
  • 相关文献

参考文献3

  • 1DL/T5064-2007,水电工程建设征地移民安置规划设计规范[S].
  • 2DE/T5378-2007水电工程农村移民安置规划设计规范[S].
  • 3DL/T5377-2007,水电工程建设征地实物指标调查规范[S].

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部