期刊文献+

飞来峡电厂1#主变保护装置技术改造

Technical Reformation of 1# Main Transformer Protection Device in Feilaixia Power Plant
下载PDF
导出
摘要 飞来峡电厂1#主变压器保护装置因超期服役、双重化配置要求和省网安评考核需要等原因进行技术改造。该文介绍了本次技改方案的内容,重点阐述方案对新增保护装置选型、配置的技术要求和具体实施过程,点明本次技术改造起到设备更新换代、提高安全系数和满足新形势需要的效果。 Feilaixia power plant 1#main transformer protection device for overterm service, double configuration requirements, and the province may be a review of the assessment need to wait for a reason technical renovation.The technical scheme and the content of the emphasis on solutions for new protection device selection and configuration of technical requirements and specific implementation process have been introduced.The technical transformation equipment upgrading, safety coefficient improvement and the needs of new situation have been pointed out as well.
作者 吴珏
出处 《广东水利水电》 2015年第4期68-71,共4页 Guangdong Water Resources and Hydropower
关键词 飞来峡电厂 1#主变 保护装置 技术改造 Feilaixia power plant 1# main transformer protection device technical transformation
  • 相关文献

参考文献2

  • 1广东省飞来峡水利枢纽管理处.广东省飞来峡水利枢纽管理处发电厂运行规程[Z].清远:广东省飞来峡水利枢纽管理处.
  • 2张侏会,尹项根.电力系统继电保护[M].北京:中国电力出版社,2005.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部