8Tark Hegazy. Cost Optimization in project with repetitive nonserial activity [ J ], Journal of Construction Engineeringand Mangac- ment, 2001, 127 (3): 183-19.
3Lawrence Bennett F, Lu Ming, Simjaan AbouRizk. Implified CPM/PERT simulation mode [ J ]. Journal of Construction Engineering and Management,2001 ( 11 ) :513-515.
4植草益.微观规制经济学[M].北京:中国发展出版社,1992..
5ICMELI O, ERENGUC S S. A branch-and-bound procedure for the resource-constrained project scheduling problem with discounted cash flows [J]. Management Science, 1996,42(10): 1395-1408.
6HEGAZY T, ERSAHIN T. Simplified spreadsheet solution II:overall schedule optimization [J]. Construction Engineering and Management, 2000, 127(6): 469-475.
7RUSSELL A H. Cash flows in networks [J]. Management Science, 1970,16:357-373.
10Tang L, Sben Q, Cheng E W. A review of studies on pub- lic-private partnership projects in the construction industry [J]. International Journal of Project Management, 2010, 28(7) : 683-694.
5Istemi Demirag, Iqbal Khadaroo, Pamela Stapleton, Caral Stevenson. Risks and the financing of PPP: Perspectivesfrom the financiers [ J]. The British Accounting Review, 2011 , 43 (4).
6Lamb, D. J.,Mema, T. Refinancing and Restructuring of Build-Operate-Transfer (BOT) Projects [J]. Journalof Structured and Project Finance, 2004, 10 (1).
7Steven Tomsa,Matthias Becka,Darinka Asenovab. Accounting, regulation and profitability : The case of PFI hospitalref,mancing [J]. Critical Perspectives on Accounting, 2011, (22).
8宋金龙.基于实物期权的PPP项目再融资研究[D].成都:西南交通大学,2011.
9Engel E,Fischer&Galetovic. A Least -Present -V alue - of- Revenue Auctions and Highway Franchising [ J]. Journalof Political Economy,2001,(5).
10Guasch, J. L. Granting and Renegotiating Infrastructure Concessions: Doing it Right [ M]. Washington D. C:WBI Development Studies, 2004.