1Officer Asset Management, Department of Transportation, FHWA. Life-Cycle Cost Analysis Primer[R].2002.
2Kong J S, Frangopol D M. Prediction of reliability and cost of deteriorating bridges under time-and performance-controlled maintenance [J]. J. of Str.Eng., ASCE, 2004,130(12).
3Hassanain M A, Loov R E. Cost optimization of concrete bridge infrastructure[J]. Canadian Journal of Civil Engineering, 2003,30.
4Liu C, Hammad A, Itoh Y. Multiobjective optimization of bridge deck rehabilitation using a genetic algorithm [J]. Computer-aided Civil and infrastructure Engineering, 1997,12.
5Miyamoto A, Kawamura K, Nakamura H. Bridge management system and maintenance optimization for existing bridge [J]. Computer-aided Civil and Infrastructure Engineering, 2000,15.
6Lee Y J, Chang L M. Rehabilitation decision analysis and life-cycle costing of the infrastructure system[J].Construction Research, 2003.
7Kong J S, Frangopol D M. Life-Cycle Rehiability-Based Maintenance Cost Optimization of Deteriorating Structures with Emphasis on Bridges [J]. Journal of Structural Engineering, 2003,129 (6).
8Kong J S, Frangopol D M, Cost-Reliability Interaction in Life-Cycle Cost Optimization of Deteriorating Structures [J]. Journal of Structural Engineering. 2004,130(11).
9Peng J X, Shao X D. Research framework of lifetime performance based bridge design method E R 7.Proceeding of the 2nd International Conference of Structural Health Monitoring of Intelligent Infrastructure, 2005.
10Building Better Bridges with CFRP[J].Reinforced Plas-tic,1998,(3): 44-45,47.