摘要
对高煤公司孤岛工作面开采过程冲击地压威胁进行分析后,对采区工作面布置方案进行了优化,形成了防冲-抗震的工作面接续方案,从而确保了安全生产。
Aiming at the mine earthquake and rockburst problems that will be caused by the primary working face layout scheme, this paper optimized the arrangement plan of the island working face, formed the rockburst prevention and G-shock continue scheme, so as to ensure the safety of the working face and ground facilities, and provide a reference for other similar coal mine safety production.
出处
《山东煤炭科技》
2015年第6期39-41,共3页
Shandong Coal Science and Technology
关键词
孤岛工作面
砾岩
冲击地压
矿震
isolated working face
conglomerate
rockburst
mine earthquake