摘要 星村煤矿地质条件较复杂,地压作用较明显,掘进施工难度大。矿井西翼绞车房处于DF50断层上盘,落差达到350~400m。针对西翼绞车房大断面支护问题进行了研究与应用,采用导硐法施工,利用锚网喷+锚索联合支护设计方案,取得了良好的支护效果。 According to the complex geological conditions ,and the obvious effect of ground press of xingcun coal mine, which cause the tunneling construction dififculty. Mine winch room in the West Wing is in the hanging wall of the fault DF50 that fall reached 350-400m, this paper researched the supporting problem of the winch room with large-section in the West Wing, using the pilot tunnel construction method, and the spray anchor net and anchor combined support design, achieved good supporting effect.
出处 《山东煤炭科技》 2015年第6期137-139,共3页 Shandong Coal Science and Technology
关键词 深井 侏罗纪红层砂岩 大断面 导硐法 锚网喷+锚索联合支护 deep shaft Jurassic red beds sandstone large section pilot method anchor net spray and anchor combined support
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部